1848

National School: almost finished after delay. To be opened end of September. From the design of Moffatt. Daniel Evans, clerk of works. Opened to pupils. Caernarfon slate roof.

20 Oct Welshman: R K Penson, Co Surveyor has examined the Gaol. Building both inside and outside was in a very bad state. Built with very inferior materials and in an unsuitable manner.

Mayor: William Phillips